Serving Tampa & Hillsborough County  ·  Call +1 (813) 535-8769 for a written quote
Tampa Bay · Kitchen Remodeling

Kitchen Remodeling Tampa

Kitchen Remodeling Tampa, built by the crew Tampa homeowners already trust with their bathrooms: cabinets that fit, counters that last, and a layout that makes cooking easier every single day.

Typical Tampa price: $15,000 to $75,000 · Timeline: 4 to 10 weeks · Fixed written quote

Ranges are a guide, not the price: the final price is confirmed after seeing the job, in a written quote before work starts.

☎  Call +1 (813) 535-8769 Cost guide
Kitchen Remodeling Tampa with white shaker cabinets, quartz island, and brass pendants

A kitchen remodel in Tampa typically costs $15,000 to $35,000 for a cosmetic refresh and $35,000 to $75,000 for a full remodel with new cabinets and quartz counters in the same layout. Moving walls or plumbing raises the price. Most builds take 4 to 10 weeks, with a fixed written price before work starts.

Kitchen Remodeling Tampa: Start With the Layout

Every good kitchen starts with the layout, not the finishes. Where do you chop, cook, and clean up? In most Tampa homes the answer is a work triangle that almost works: the fridge too far from the sink, the range boxed into a corner, no landing space next to either. A remodel that keeps a bad layout and only swaps the surfaces is money spent twice. We draw the layout first, price it both ways, and show you exactly what a layout change adds before you decide.

The neighborhoods we work in each bring their own puzzle. South Tampa and Hyde Park kitchens often need to respect older homes while cooking like new ones. Seminole Heights bungalows have galley kitchens where an island is impossible and a well planned peninsula changes everything. In Westchase, Carrollwood, and New Tampa, the 1990s builder kitchen is the classic job: good bones, tired oak cabinets, and a soffit that wants to come down. In Brandon and Riverview, growing families ask for the same thing every week: a big island with seating, storage for small appliances, and room for two cooks. The plan follows the house, and the house follows how you actually live in it.

Cabinets and Countertops: Where Most of the Budget Goes

Cabinets and counters together take half or more of a typical kitchen budget, and they are the two choices you touch every day. Semi-custom cabinets are the sweet spot for most Tampa homes: real plywood boxes, soft-close hardware, and sizes that fit your walls without custom prices. For counters, quartz is our default recommendation in this climate. It never needs sealing, shrugs off heat and stains, and stays consistent from slab to slab. Granite and quartzite are close seconds; butcher block earns its keep on an island, not next to a sink. Many homeowners pair the kitchen with a small bathroom remodel while the crew and the dumpster are already at the house. It is the cheapest moment to do both.

What a Tampa Kitchen Remodel Costs

ProjectTypical Tampa rangeTimeline
Cabinet refacing and paint$8,000 to $18,0001 to 2 weeks
Cosmetic refresh (counters, backsplash, lighting, same cabinets)$15,000 to $35,0002 to 4 weeks
Full remodel (new cabinets, quartz counters, same layout)$35,000 to $75,0006 to 10 weeks
Layout change (walls moved, plumbing relocated, island added)$60,000 to $110,0008 to 14 weeks
Upscale kitchen (custom cabinets, high-end appliances)$110,000 to $175,000+12 to 20 weeks

Typical, estimated ranges for Tampa homes. Ranges are a guide, not the price: the final price is confirmed after seeing the job, in a written quote before work starts.

From Design to Done: Permits and Process

The order of work decides whether a kitchen remodel feels smooth or endless. Ours runs like this: design and selections first, with every cabinet, counter, and fixture chosen and priced. Permits next, filed while the cabinets are being built, so no one waits on paperwork with a torn-out kitchen. Then demolition, rough electrical and plumbing, inspections, cabinets, and counters templated off the installed cabinets, which is the only way counters fit perfectly. Tile, lighting, appliances, and paint finish the job, and a walkthrough closes it.

How Long You Will Be Without a Kitchen

Less time than you fear, if the job is sequenced right. A refacing or refresh leaves you cooking again in 1 to 4 weeks. A full remodel usually means 4 to 10 weeks of a partial kitchen: the fridge stays plugged in, a temporary sink is often possible, and the stove is the last thing out and the first thing back. We give you the no-kitchen days in writing before demolition starts, and we hit them. Kitchens run late when cabinets get ordered after demolition. Ours get ordered before it.

What's included

  • Design and layout plan, measured in your kitchen
  • Cabinets: refacing, semi-custom, or full custom
  • Quartz and stone countertops, templated after the cabinets are set
  • Island additions with seating, storage, and power
  • Lighting plan: pendants, under-cabinet lights, and recessed cans
  • Flooring: tile or luxury vinyl plank, leveled and sealed
  • Permits, inspections, and daily cleanup handled by us

Built for Tampa

Tampa kitchens sit on concrete slabs, so moving a sink or a gas range costs real money in saw-cut concrete and new lines. Many 1970s ranch kitchens hide plumbing and wiring inside soffits, and bungalow kitchens in Seminole Heights and Ybor were built small on purpose. Add our humidity, which swells cheap cabinet boxes and rusts hinges, and the details matter here in ways they simply do not up north. We spec cabinets, venting, and materials for this climate from the start.

Common questions

How much does a kitchen remodel cost in Tampa?

A cosmetic kitchen refresh in Tampa typically runs $15,000 to $35,000. A full remodel with new cabinets and quartz counters in the same layout runs $35,000 to $75,000. Moving walls, plumbing, or gas lines pushes a project to $60,000 and up. Cabinets are the biggest line item, usually 30 to 40 percent of the budget. We price every project fixed and in writing after seeing your kitchen.

How long does a kitchen remodel take?

Plan on 8 to 14 weeks from first design meeting to final walkthrough. Design and selections take 2 to 4 weeks, permits 2 to 6 weeks while cabinets are being built, and the build itself 4 to 10 weeks depending on scope. We do not start demolition until your cabinets are in town, so the construction window stays as short as it can.

Do I need a permit for a kitchen remodel in Tampa?

Usually, yes. Moving walls, adding or moving electrical circuits, plumbing, or gas lines all need a permit, through the City of Tampa inside city limits or Hillsborough County in unincorporated areas. Swapping cabinets and counters like for like, with nothing moved, often needs no permit. We handle the permit and the inspections either way, and we will tell you up front which rules apply to your project.

Can I stay in my home during a kitchen remodel?

Almost everyone does. We seal the work area with plastic and dust control, and most families set up a temporary kitchen with a microwave, a coffee maker, and a folding table in another room. Expect a few days with the sink or stove disconnected, and a stretch of takeout. We give you a written schedule so you know which days those are before we start.

Should I reface my cabinets or replace them?

Reface if the cabinet boxes are solid and the layout works: new doors, drawer fronts, and hardware over your existing boxes, typically $8,000 to $18,000. Replace if you want a new layout, taller cabinets, or soft-close drawers, or if the boxes are particleboard and swollen from years of Tampa humidity. We will open a few doors and tell you honestly which route your cabinets qualify for.

Still deciding between projects? Compare all our bathroom remodeling services in Tampa side by side, or browse the bathroom remodel questions Tampa homeowners ask us before they book.

Written quotes

Ready when you are.

Call us for a fixed written quote on your kitchen remodeling project. No pressure, no obligation.

+1 (813) 535-8769 ☎  Call now
Call +1 (813) 535-8769